Converted a large, existing tool and die warehouse into a manufacturing facility for Berman Bedding. A second floor office suite was added on the existing mezzanine. Berman Bedding was able to relocate all their downtown manufacturing operations into the new building.
Architect: Roth Marz Partnership, Erie PA 16508