Retail / Hospitality

Presque Isle Downs Racetrack and Casino

Attention, open in a new window. Print

We were awarded several contracts on this project:

Casino Foundation - The foundation work consisted of 70' deep auger cast piles, concrete beams, pile caps and pipe tunnels. 

Casino Clubhouse - The main contract for the concrete and general trades work for this 140,000sf clubhouse. 

Grooms Quarters - Two-story, 12,800sf structural metal framed slab on grade and slab on deck floor, wood trusses with shingle roof and vinyl siding.

Table Games Addition - 14,000sf addition and renovation to 20,000sf of the existing casino space. 

Architects:  Weborg Rectenwald Buehler Architects,  Erie, PA   

                 Buehler & Associates, Inc.,  Erie, PA

                 SOSH Architect,  Atlantic City, NJ

 

Gander Mountain

Attention, open in a new window. Print

Gander Mountain

New 30,000sf retail space in Erie, PA with bearing masonry walls, steel joists and deck, interior studs and drywall, and interior finishes.

Architect:  Design Forum Architects, Dayton, OH

   

Sheraton Bayfront Hotel

Attention, open in a new window. Print

Work included interior casework, wood trim, acoustical ceilings, ornamental railings, stone, counter tops, specialties, and swimming pool.  

Architects:    DRS Architects, Pittsburg,  PA

                   Urban Engineers,  Erie, PA

 

Holiday Valley-Tamarack Club

Attention, open in a new window. Print


Concrete foundations, flatwork, roof structure, precast parking deck, and sidewalks comprised the work on this 140,000sf resort lodge.

Architect:  Weber Murphy Fox,  Erie, PA