Lake Erie Biofuels (2007)
New bio-diesel plant in Erie, PA. Work included two 10,000-SF processing buildings (mat foundations, masonry walls, interiors, and mechanical work) and concrete and liner for 21 ringwalls (15’ to 80’ in diameter).
Engineer: Benham Constructors, Oklahoma City, OK www.benham.com
Ellwood National Steel Melt Shop Modernization (2005)
Renovate previously abandoned melt shop in Irvine, PA. Work included demolition of existing foundations, new 120’ long x 30’ wide x 27’ deep ingot pit (sheetpiling, excavation, concrete walls, steel liner panels), mass equipment foundations, control room addition.
Engineer: CH2M Hill (formerly Lockwood-Greene), Moon Township, PA www.lg.com
Nestle-Purina Meaty Treats Expansion (2006)
Demolition, foundations, structural steel, and electrical work for new meal bin, north and south penthouses on existing building in Dunkirk, NY. At about the same time, we also did work on a Packaging Mezzanine, other work platforms and stairs, an MCC Room addition, and steel plate bin dividers.
Engineer: Nestlé-Purina, St. Louis, MO
Jamestown BPU Generating Station (2000)
Generating station in Jamestown, NY. Work included mass foundations, caissons, structural steel building, ground grid, gas turbine generator, heat recovery steam generator, stacks, and miscellaneous equipment.
Engineer: Stowe Engineering Corp., Norwell, MA