• North East Wastewater Treatment Plant
  • North East Wastewater Treatment Plant
  • North East Wastewater Treatment Plant
  • North East Wastewater Treatment Plant

This project began in November 2009 on two sites. E.E. Austin's work includes all of the concrete structures, new masonry buildings, new wood pole barns, as well as all treatment equipment and piping.

Site I work includes several buildings, including a garage, two pump and blower buildings, an aeration tank, a 78' x 78' aerobic digester, and headworks building.

Site II includes an 86' diameter treatment tank, reactor clarifier, headworks building, two blower buildings, sludge building, and several other structures. The project adds a third treatment "train" to the plant. The train is now operational and the two existing trains are being renovated.