Industrial
Lake Erie Biofuels (2007)
New bio-diesel plant in Erie, PA. Work included two 10,000-SF processing buildings (mat foundations, masonry walls, interiors, and mechanical work) and concrete and liner for 21 ringwalls (15’ to 80’ in diameter).
www.lakeeriebiofuels.com
Engineer: Benham Constructors, Oklahoma City, OK www.benham.com
Ellwood National Steel Melt Shop Modernization (2005)
Renovate previously abandoned melt shop in Irvine, PA. Work included demolition of existing foundations, new 120’ long x 30’ wide x 27’ deep ingot pit (sheetpiling, excavation, concrete walls, steel liner panels), mass equipment foundations, control room addition.
Engineer: Lockwood-Greene (now a division of CH2M Hill), Moon Township, PA www.ch2m.com/corporate/clients/lg.asp
Metro Machine Intermediate Graving Dock (2004)
Construction of a removable watertight dock gate 120' long and 33' high with concrete foundation and abutments. Modification of existing sump and dewater system, along with gate and dry dock startup and testing.
The facility is now leased by Erie Shipbuilding LLC www.erieshipbuilding.com
Engineer: Urban Engineers of Erie, Inc., Erie, PA www.urbanengineers.com/urbanoffices/erie.html
Jamestown BPU Generating Station (2000)
Generating station in Jamestown, NY. Work included mass foundations, caissons, structural steel building, ground grid, gas turbine generator, heat recovery steam generator, stacks, and miscellaneous equipment.
|
|
Engineer: Stowe Engineering Corp., Norwell, MA