Metro Machine Intermediate Graving Dock

Metro Machine Intermediate Graving Dock

Attention, open in a new window. Print

Construction of a removable watertight dock gate 120' long and 33' high with concrete foundation and abutments.  Modification of existing sump and dewater system, along with gate and dry dock startup and testing.

The facility is now leased by Erie Shipbuilding LLC

Engineer:  Urban Engineers of Erie, Inc., Erie, PA